Skip to content
2A Construction Logo
Home
AllGeneralRefurbishmentLoftExtentionRoofingPainting and DecoratingFlooringPlumbingElectrical
ServicesAbout usContactCertifiations and Compilance
Sign inCreate account
2A Construction Logo
Home
ServicesAbout usContactCertifiations and Compilance
Sign inCreate account
2A Construction

Premium construction across London — extensions, loft conversions, roofing, HMO conversions & full domestic refurbishments.

  • 2a.construction.uk@gmail.com
  • +44 790 3095 967
  • London, UK

Company

  • About Us
  • Projects
  • Contact
  • Certifications

Services

  • Extensions
  • Loft Conversions
  • Roofing
  • Refurbishments
  • Painting & Decorating
  • Flooring
  • Plumbing
  • Electrical
  • HMO Conversions
  • Commercial Change-of-Use

Policies & Compliance

  • Anti-Bribery & Corruption Policy
  • Health & Safety Policy
  • Environmental Policy
  • Modern Slavery Policy
  • GDPR / Data Protection Policy
  • SafeWorkforce Policy
  • Privacy Policy (Coming Soon)
  • Terms & Conditions (Coming Soon)

© 2026 2A Construction Ltd. All rights reserved.

Registered in England & Wales • Company No: 15102296

Portfolio/Rear Extension – Drainage Diversion & Groundworks
Project image 1

Rear Extension – Drainage Diversion & Groundworks

2/6/2026extentionpublished

This project shows the early-stage works for a rear extension, focusing on full drainage diversion, ground preparation, and site setup. Before starting brickwork or foundations, our team carried out essential underground works to ensure the new extension is fully compliant, waterproof, and structurally sound. ⚙️ Scope of Works Completed: 1️⃣🛠 Excavation & Exposure of Existing Services - Careful excavation along the property boundary - Identification of existing clay and plastic drainage lines - Removal of debris, collapsed soil and old brickwork - Safe working area created with temporary weather protection 2️⃣🛠 Full Drainage Diversion & Reconfiguration - Installation of a new three-way drainage chamber - Redirection of foul and surface water lines to accommodate the extension footprint - Removal of old damaged pipework - New 110mm underground drainage installed with correct falls - Proper connection of rainwater downpipe into the new drainage system 3️⃣🛠 Bedding & Structural Support - All new pipework bedded on compacted MOT/gravel and concrete haunching - Chambers set at correct levels for future access and maintenance - Testing for flow and leak prevention 4️⃣🛠 Ground Preparation for Extension Build - Trench clearing for future foundation pouring - Protection of existing structure - Site organised for next phase: foundation works and slab preparation 🏗 Purpose of These Works - Proper drainage to avoid future flooding - Compliance with UK Building Regulations (Part H) - Long-term structural stability - Safe integration of new rainwater and foul water systems

More featured work

Rear Extension – Drainage Diversion & Groundworks | Our Projects | 2A Construction
Featured

Featured Projects

A quick look at some recent work across extensions, lofts and refurbishments.

View all projects →
Custom Garden Planters & Landscaping Installation cover

Custom Garden Planters & Landscaping Installation

Installation of custom raised garden planters with ground preparation. Built to create a clean, modern, and durable garden feature. Project completed by 2A Construction Ltd.

View project
Loft Conversion -Ongoing Project  cover

Loft Conversion -Ongoing Project

Loft Conversion -Ongoing Project

View project
New Roof Structure Construction – Timber Frame & Pitched Roof Build cover

New Roof Structure Construction – Timber Frame & Pitched Roof Build

This project shows the progress of an ongoing roof construction carried out by our team. The works include building the new timber roof structure, installing rafters and structural supports, and preparing the roof for the next stages of construction. At 2A Construction Ltd, we specialise in roofing works, loft structures, extensions, and full refurbishments, delivering reliable and high-quality.

View project